Since Lentor Modern opened the enclave in September 2022, six private condos have launched and sold through, with Lentoria the last of them to still have a handful of units. Lentor Gardens Residences launched on 18 July 2026 and is the current launch.

Sources: ERA Research (Lentor Central GLS analysis, March 2026), EdgeProp, 99.co, project site. Indicative; confirm before relying on them.
ProjectUnitsLaunchedSoldWalk to MRT (m)Expected TOP
Lentor Modern605Sep 2022100%214Completed or near completion
Hillock Green474Nov 202398%277About 2027 to 2028
Lentoria267Mar 202490%369About 2027 to 2028
Lentor Mansion533Mar 2024100%4002028
Lentor Gardens Residences499Jul 202660% of homes (30 Sep 2026)450Sep 2029

Other Lentor launches

Lentor Hills Residences (598 units) and Lentor Central Residences are also part of the enclave and have sold out. They are not in the table above because their published figures vary across sources, but both are covered in resale condos in Lentor for buyers looking for a completed or near-completed unit.

What is still to come

A further Lentor Central parcel was awarded in March 2026, so more supply is expected in the enclave over the coming years. Timing is the developers' decision.

Keep reading

Get the latest Balance Unit Report

Remaining units, latest developer prices, stack and facing, floor and recent transactions. Updated weekly.

Get the latest report

Talk to the agent

Velisa Leong

Division Director, ERA Realty Network Pte Ltd. CEA Reg. No. R053331B.

Questions about a specific unit, your budget, or the timing of an HDB sale? Message directly and get an answer for your situation.

Get the latest Balance Unit Report